Generator CategoryDescriptionEntegrus Cost
10 kW or lessAll net metering projects with a generation nameplate of 10 kW or less (CIA not required for metering projects 10 kW or less)$0.00

Greater than 10 kW and less than 500 kW

All load displacement and net metering projects with a generation nameplate of greater than 10 kW and less than 500 kW$3,000.00
Greater than 500 kW

All load displacement with a generation nameplate of greater than 500 kW

$3,000.00

NOTES:

  • These are Entegrus Connection Impact Assessment (CIA) fees only. Upstream transmitter CIA study fees may apply* See Hydro One fee schedule. 
  • These fees are for the CIA study only, and do not include any required construction costs, telemetry, metering, etc. 

Hydro One Station Capacity Calculator 

Use the Hydro One Station Capacity calculator tool to determine if the grid has capacity for your project. There is a limit to how much generation can be installed in order to maintain the integrity and reliability of the grid. Entegrus uses this capacity calculator as a preliminary check.