CIA Fee Schedule

Entegrus Connection Impact Assessment (CIA) Fee Schedule

Generator CategoryDescriptionEntegrus Cost
10 kW or lessAll net metering projects with a generation nameplate of 10 kW or less (CIA not required for metering projects 10 kW or less)$0.00
Greater than 10 kW and less than, or equal to, 100 kW

All three-phase generation project (including net metering, load displacement and energy storage systems) applications that are:
 

a) > 10 kW and ≤ 30 kW connecting to an Entegrus supply feeder with a voltage less than 15 kV.
 

OR
 

b) > 10 kW and ≤ 100 kW connecting to an Entegrus supply feeder with a voltage of 15 kV or greater.

 

Note: Single phase generation project applications are not eligible for this category.

$5,054.41

 

($5,711.48 including HST)

Greater than 100 kW and less than, or equal to, 500 kW

(Excluding Net Metering)

1) All three-phase generation project (including load displacement and energy storage systems but excluding net metering) applications that are:
 

a) > 30 kW and ≤ 250 kW connecting to an Entegrus supply feeder with a voltage less than 15 kV.
 

OR
 

b) > 100 kW and ≤ 500 kW connecting to an Entegrus supply feeder with a voltage of 15 kV or greater.

2) Single-phase generation projects (excluding net metering) applications connecting to an Entegrus supply feeder that are greater than 10 kW.

 

Note: Single phase generation project applications cannot exceed 150 kW

$6,405.38

 

($7,238.08 including HST)

Greater than 100 kW and less than, or equal to, 500 kW

(Net Metering)

1) All three-phase net metering generation project applications that are:
 

a) > 30 kW and ≤ 250 kW connecting to an Entegrus supply feeder with a voltage less than 15 kV.
 

OR
 

b) > 100 kW and ≤ 500 kW connecting to an Entegrus supply feeder with a voltage of 15 kV or greater.

2) All single-phase net metering generation project applications that are greater than 10 kW.

 

Note: Single phase generation project applications cannot exceed 150 kW

$6,762.74

 

($7,641.90 including HST)

Greater than 500 kW and less than 10,000 kW

Capacity Allocation Required Projects

All generation project applications (including net metering, load displacement and energy storage systems) that are:
 

a) > 250 kW and < 500kW connecting to an Entegrus supply feeder with a voltage less than 15 kV.
 

OR
 

b) > 500 kW and < 10,000 kW connecting to an Entegrus supply feeder with a voltage of 15 kV or greater.

$12,011.83

 

($13,573.37 including tax)

Greater than, or equal to, 10,000 kW

Capacity Allocation Required Projects

All generation project applications (including net metering, load displacement and energy storage systems) that are:

a)  ≥ 500 kW connecting to an Entegrus supply feeder with a voltage less than 15 kV;

OR

b) ≥ 10,000 kW connecting to an Entegrus supply feeder with a voltage of 15 kV or greater.
Please contact Entegrus Powerlines.

NOTES:

  • These fees are for the CIA study only, and do not include any required construction costs, telemetry, metering, etc. 

Hydro One Station Capacity Calculator 

Use the Hydro One Station Capacity calculator tool to determine if the grid has capacity for your project. To maintain the integrity and reliability of the grid there is a limit to how much generation can be installed. Entegrus uses this capacity calculator as a preliminary check.

Download the Station Capacity Calculator